Welcome to visit JTP mould Co.,Ltd
Jtp mould factory can tailor various kinds of plastic spoon mould for each customers as per their requirements.The quotation can be made based on drawing or samples provided by the customers,our products are both excellent in quality and reasonable in price.Your satisfaction is guarantee.


high quality plastic spoon moulds made in huangyan china
1. Details on the mould :
Name high quality plastic spoon moulds made in huangyan china
mould material 45# 50# 718 2738 P20 S136 etc
cavity single cavity
runner hot runner
mould design 3D/2D
design days 3-5 days
mould life 500, 000~ 1 million shots
plastic material PP
injection system direct gate
payment 40% of deposit by L/C T/T 60% of balance by L/C T/T
delivery time 50-60 days
specification depends on customers' demand
More information about our company :
Our company  is located in Huangyan,Zhejiang,China.
We have a full range of CNC machining centers, large gantry milling machines, vertical milling machines, CNC engraving Machines, electric spark(EDM), wire-cutters,etc. We have advanced technology for CAD / CAM / CAE design and rich experiences in mould making. This makes us to have great ability to manufacture big size moulds, complex moulds, deep-cavity moulds,thin wall moulds and high precision moulds.
We have a strong technical team. We have 5 senior designers and 20 engineers who has more than 15years experiences in mould making. Our designers are good at designing new products and mould structure. In order to avoid any defects during the mould manufacturing, we usually do the mould flow analysis for the mould before we start the work on it. After mould flow analysis, we decide the mould injection gate and structure. Therefore, the mould can be finished succes
This is my contact information,I will be so happy to be your advisor in JTP MOULD:
Mobile:0086-18858627516
This product/mould is Customized. If you would like to
have a custom made product/mould, follow these steps, please!
1, Please contact and inform me if you would like to send a product sample.
  Our address:XiCheng Mould City,Huangyan,Taizhou,Zhejiang,China
  zip code:318020  Consignee: Malinda ao
2, Tell me your mould requirements:
A, cavity(if not sure, tell me your Estimated Annual usage, our designers
 could suggest appropriate cavity );
B, mould life (choose suitable mould material based on it);
C, product material ;
D, mould making time (in general, mould making time is 20~45 working
 days, if rush order, inform me, please)
3, Quotation: according to your requirements, I will send you a quotation
   list in 1~2 workdays.
4, Feedback: Give me your feedback without delay, please! We are deeply
   grateful.
5, Continue Cooperation:
According to sample, design product and mould drawing, and arrange production.
Good News:
1. We will make 3D drawing for you in free of charge accoding to your samples
2. We are able to make manual sample/model according to you prototype or drawings
3. Our 3D design software: SOLIDWORK/ UG/CAD and PDF
FAQÂ Â Â why choose us?The advantage of JTP MOULD:
1). Prompt response within 24hours. .
2). Good Quality. .
3). Reasonable price.
4). Excellent after-sales services. If as technical skill Lifelong free repair .
Bitumen Heating Storage Equipment
Asphalt heating storage equipment is an important road construction equipment, mainly used to heat and store asphalt in order to carry out road construction and maintenance when needed. The equipment has the characteristics of high efficiency, safety and environmental protection, and can provide stable asphalt supply for road construction.
Asphalt heating storage equipment is mainly composed of heating device, storage tank and control system. The heating unit uses oil or gas burners to transfer heat to the asphalt to heat it to the proper temperature. Storage tanks are large containers used to store heated asphalt, generally made of high-temperature resistant materials. The control system is responsible for monitoring the operating status of the equipment and the temperature of the asphalt to ensure the safe and stable operation of the equipment.
The heating principle of asphalt heating storage equipment is to transfer heat to asphalt through thermal conduction, so that it is heated. Heating devices are generally divided into direct heating and indirect heating in two ways. Direct heating is the use of the burner directly into the storage tank, hot air through the contact of hot air with the asphalt to heat it. Indirect heating is the use of heat exchangers to heat the asphalt in the storage tank without direct contact with the air. The two heating methods have advantages and disadvantages, and need to be selected according to the actual situation.
Asphalt heating storage equipment heating speed, can quickly heat asphalt to the use of temperature, improve production efficiency. At the same time, the equipment also has environmental protection characteristics, reducing exhaust gas and smoke emissions, reducing the impact on the environment. In addition, the operation of asphalt heating storage equipment is simple and easy to maintain, which can meet the needs of various road construction and maintenance projects.
In short, asphalt heating storage equipment is an important road construction equipment, with high efficiency, safety, environmental protection and other characteristics. It can provide a stable supply of asphalt for road construction, improve construction efficiency, reduce the impact on the environment and waste of resources. The equipment has a wide application prospect in the field of road construction.
Bitumen Heating Storage Equipment,Bitumen Tank Container,Gas Thermal Oil Heater,Asphalt Storage Tank Equipment
BituRock Science & Technology (Jiangsu) CO., LTD , https://www.biturockequipment.com